This topic contains a solution. Click here to go to the answer

Author Question: What types of claims could arise related to the use of Building Information Modeling software on ... (Read 17 times)

burchfield96

  • Hero Member
  • *****
  • Posts: 610
What types of claims could arise related to the use of Building Information Modeling software on construction projects?
 
  What will be an ideal response?

Question 2

Pretreatment of boiler feedwater __________________.
 
  A. consists of heating, softening and reverse osmosis treatment, and is done to limit the amount of chemicals necessary
  B. consists of chemical treatment and is used to raise the Ph of the feedwater
  C. consists of chemical treatment and is used to lower the Ph of the feedwater
  D. is only used on large boilers operating for a power utility



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

mistyjohnson

  • Sr. Member
  • ****
  • Posts: 331
Answer to Question 1

The potential types of claims that could arise related to the use of Building Information Modeling are the following:

a) Liability issues related to generating three dimensional models using drawings
from several different firms and who would be responsible for errors.
b) Disputes arising from software incompatibility and inaccurate data being
uploaded into the BIM software, as a result of incompatibility.
c) Disputes arising from changes being made after drawings are uploaded into the
three dimensional models on the two dimensional drawings.
d) Disputes from changes resulting from clashes between construction elements
designed by members of different firms.
e) Disputes resulting from how construction elements are displayed in a three
dimensional model versus how they are shown on individual engineering or shop
drawings.
f) Disputes prompted by the engineering drawings not containing all of the changes
that were made on the three dimensional model, although the three dimensional
modeling software is suppose to transpose the three dimensional model back
into accurate two dimensional drawings.

Answer to Question 2

A




burchfield96

  • Member
  • Posts: 610
Reply 2 on: Jul 26, 2018
Great answer, keep it coming :)


atrochim

  • Member
  • Posts: 331
Reply 3 on: Yesterday
YES! Correct, THANKS for helping me on my review

 

Did you know?

There are immediate benefits of chiropractic adjustments that are visible via magnetic resonance imaging (MRI). It shows that spinal manipulation therapy is effective in decreasing pain and increasing the gaps between the vertebrae, reducing pressure that leads to pain.

Did you know?

HIV testing reach is still limited. An estimated 40% of people with HIV (more than 14 million) remain undiagnosed and do not know their infection status.

Did you know?

About 600,000 particles of skin are shed every hour by each human. If you live to age 70 years, you have shed 105 pounds of dead skin.

Did you know?

The Centers for Disease Control and Prevention has released reports detailing the deaths of infants (younger than 1 year of age) who died after being given cold and cough medications. This underscores the importance of educating parents that children younger than 2 years of age should never be given over-the-counter cold and cough medications without consulting their physicians.

Did you know?

Before a vaccine is licensed in the USA, the Food and Drug Administration (FDA) reviews it for safety and effectiveness. The CDC then reviews all studies again, as well as the American Academy of Pediatrics and the American Academy of Family Physicians. Every lot of vaccine is tested before administration to the public, and the FDA regularly inspects vaccine manufacturers' facilities.

For a complete list of videos, visit our video library