Author Question: If the operating software of the PCM needs updating is normally done through a PCM exchange program. ... (Read 25 times)

karlynnae

  • Hero Member
  • *****
  • Posts: 599
If the operating software of the PCM needs updating is normally done through a PCM exchange program.
 
  Indicate whether the statement is true or false

Question 2

A freeze frame is stored when a type ________ DTC is set.
 
  A) B or C B) A or C C) A or B D) C or D



kiamars2010

  • Sr. Member
  • ****
  • Posts: 341
Answer to Question 1

FALSE

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

In 1844, Charles Goodyear obtained the first patent for a rubber condom.

Did you know?

The U.S. Pharmacopeia Medication Errors Reporting Program states that approximately 50% of all medication errors involve insulin.

Did you know?

Though the United States has largely rejected the metric system, it is used for currency, as in 100 pennies = 1 dollar. Previously, the British currency system was used, with measurements such as 12 pence to the shilling, and 20 shillings to the pound.

Did you know?

In most climates, 8 to 10 glasses of water per day is recommended for adults. The best indicator for adequate fluid intake is frequent, clear urination.

Did you know?

Elderly adults are at greatest risk of stroke and myocardial infarction and have the most to gain from prophylaxis. Patients ages 60 to 80 years with blood pressures above 160/90 mm Hg should benefit from antihypertensive treatment.

For a complete list of videos, visit our video library