Author Question: Recently a shipping company took 30 samples, each of size n = 100, of packages that it was ... (Read 105 times)

mikaylakyoung

  • Hero Member
  • *****
  • Posts: 531
Recently a shipping company took 30 samples, each of size n = 100, of packages that it was responsible for delivering. Out of the 3,000 total packages, 300 were delivered late.
 
  In setting up an appropriate process control chart, what would be the correct 3-sigma upper control limit value?A) 0.03
  B) 0.13
  C) 0.19
  D) 0.07

Question 2

If a company has 12 years of annual sales data and is in need of a three-year forecast, which of the following forecasting techniques might be useful?
 
  A) Forecast generalization
  B) Seasonality processing
  C) Regression-based trend forecasting
  D) Random component analysis



IAPPLET

  • Sr. Member
  • ****
  • Posts: 333
Answer to Question 1

C

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Aspirin is the most widely used drug in the world. It has even been recognized as such by the Guinness Book of World Records.

Did you know?

In Eastern Europe and Russia, interferon is administered intranasally in varied doses for the common cold and influenza. It is claimed that this treatment can lower the risk of infection by as much as 60–70%.

Did you know?

There are over 65,000 known species of protozoa. About 10,000 species are parasitic.

Did you know?

The heart is located in the center of the chest, with part of it tipped slightly so that it taps against the left side of the chest.

Did you know?

Approximately one in four people diagnosed with diabetes will develop foot problems. Of these, about one-third will require lower extremity amputation.

For a complete list of videos, visit our video library