Author Question: In a recent report to the supply-chain manager in a major electronics company, the report writer ... (Read 110 times)

sdfghj

  • Hero Member
  • *****
  • Posts: 552
In a recent report to the supply-chain manager in a major electronics company, the report writer stated that with 90 percent confidence, the manufacturing lead time for a critical part is between 3.34 hours and 4.14 hours.
 
  Based on this information, the margin of error for this estimate is .80 hours. Indicate whether the statement is true or false

Question 2

An electronics repair shop has determined that the time between failures for a particular electronic component part is exponentially distributed with a mean time between failures of 200 hours.
 
  Based on this information, the probability that a part will not fail in the first 200 hours is 0.50. Indicate whether the statement is true or false



Athena23

  • Sr. Member
  • ****
  • Posts: 305
Answer to Question 1

FALSE

Answer to Question 2

FALSE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The most common treatment options for addiction include psychotherapy, support groups, and individual counseling.

Did you know?

In 2006, a generic antinausea drug named ondansetron was approved. It is used to stop nausea and vomiting associated with surgery, chemotherapy, and radiation therapy.

Did you know?

Walt Disney helped combat malaria by making an animated film in 1943 called The Winged Scourge. This short film starred the seven dwarfs and taught children that mosquitos transmit malaria, which is a very bad disease. It advocated the killing of mosquitos to stop the disease.

Did you know?

The word drug comes from the Dutch word droog (meaning "dry"). For centuries, most drugs came from dried plants, hence the name.

Did you know?

In the United States, there is a birth every 8 seconds, according to the U.S. Census Bureau's Population Clock.

For a complete list of videos, visit our video library