Author Question: Which of the following is critical for a lien to be valid? A) A legally sufficient description of ... (Read 150 times)

wenmo

  • Hero Member
  • *****
  • Posts: 540
Which of the following is critical for a lien to be valid?
 A) A legally sufficient description of the land
 B) The nature of the work being done
 C) The express permission of the landowner
 D) A general contractor's license

Question 2

A(n) ______ is a written statement, signed by the creditor or an authorized representative, setting forth any claim made against the debtor and the basis for it.
 A) Proof of Claim
 B) Self-Settled Trust
 C) Preferential Transfer
 D) Voidable Preference



smrerig

  • Sr. Member
  • ****
  • Posts: 325
Answer to Question 1

A

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

The average adult has about 21 square feet of skin.

Did you know?

There used to be a metric calendar, as well as metric clocks. The metric calendar, or "French Republican Calendar" divided the year into 12 months, but each month was divided into three 10-day weeks. Each day had 10 decimal hours. Each hour had 100 decimal minutes. Due to lack of popularity, the metric clocks and calendars were ended in 1795, three years after they had been first marketed.

Did you know?

Always store hazardous household chemicals in their original containers out of reach of children. These include bleach, paint, strippers and products containing turpentine, garden chemicals, oven cleaners, fondue fuels, nail polish, and nail polish remover.

Did you know?

There are over 65,000 known species of protozoa. About 10,000 species are parasitic.

Did you know?

Asthma attacks and symptoms usually get started by specific triggers (such as viruses, allergies, gases, and air particles). You should talk to your doctor about these triggers and find ways to avoid or get rid of them.

For a complete list of videos, visit our video library