Identify and briefly discuss the implications to a project team of classifying a piece of software as safety critical.

Question 2

What is the difference between system reliability and system safety? Give an example of a system that operates reliably but not safely.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

DHRUVSHAH

  • Sr. Member
  • ****
  • Posts: 317
Answer to Question 1

When developing safety-critical systems, a key assumption must be that safety will not automatically result from following an organizations standard development methodology. Safety-critical software must go through a much more rigorous and time-consuming development process than other kinds of software. All tasksincluding requirement definition, systems analysis, design, coding, fault analysis, testing, implementation, and change controlrequire additional steps, more thorough documentation, and vigilant checking and rechecking. As a result, safety-critical software takes much longer to complete and is much more expensive to develop.

Answer to Question 2

Reliability and safety are two different system characteristics. Reliability has to do with the capability of the system to continue to perform; safety has to do with the ability of the system to perform in a safe manner. Thus, a system could be reliable but not safe. For example, an antiaircraft missile control system may continue to operate under a wide range of operating conditions so that it is considerably reliable. If, however, the control system directs the missile to change direction and to fly back into its launching device, it is certainly unsafe.




Cooldude101

  • Member
  • Posts: 557
Reply 2 on: Jun 24, 2018
Thanks for the timely response, appreciate it


parshano

  • Member
  • Posts: 333
Reply 3 on: Yesterday
YES! Correct, THANKS for helping me on my review

 

Did you know?

For high blood pressure (hypertension), a new class of drug, called a vasopeptidase blocker (inhibitor), has been developed. It decreases blood pressure by simultaneously dilating the peripheral arteries and increasing the body's loss of salt.

Did you know?

There are 60,000 miles of blood vessels in every adult human.

Did you know?

Common abbreviations that cause medication errors include U (unit), mg (milligram), QD (every day), SC (subcutaneous), TIW (three times per week), D/C (discharge or discontinue), HS (at bedtime or "hours of sleep"), cc (cubic centimeters), and AU (each ear).

Did you know?

The word drug comes from the Dutch word droog (meaning "dry"). For centuries, most drugs came from dried plants, hence the name.

Did you know?

Barbituric acid, the base material of barbiturates, was first synthesized in 1863 by Adolph von Bayer. His company later went on to synthesize aspirin for the first time, and Bayer aspirin is still a popular brand today.

For a complete list of videos, visit our video library