Author Question: 3-M Corporation puts together teams of employees from various functional areas such as engineering, ... (Read 88 times)

leo leo

  • Hero Member
  • *****
  • Posts: 566
3-M Corporation puts together teams of employees from various functional areas such as engineering, production, finance, and marketing who share a common purpose, such as new-product development. These types of teams are referred to as _____.
 a. cross-functional teams
  b. syndicated teams
  c. synergistic teams
  d. focus groups

Question 2

The one-group pre-test-post-test design is represented symbolically by O1 X O2..
 
 Indicate whether the statement is true or false



juliaf

  • Sr. Member
  • ****
  • Posts: 344
Answer to Question 1

A

Answer to Question 2

T
This pre-experimental design uses a pre-test before the treatment and a post-test after the treatment.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

Multiple sclerosis is a condition wherein the body's nervous system is weakened by an autoimmune reaction that attacks the myelin sheaths of neurons.

Did you know?

Colchicine is a highly poisonous alkaloid originally extracted from a type of saffron plant that is used mainly to treat gout.

Did you know?

People often find it difficult to accept the idea that bacteria can be beneficial and improve health. Lactic acid bacteria are good, and when eaten, these bacteria improve health and increase longevity. These bacteria included in foods such as yogurt.

Did you know?

On average, someone in the United States has a stroke about every 40 seconds. This is about 795,000 people per year.

Did you know?

According to animal studies, the typical American diet is damaging to the liver and may result in allergies, low energy, digestive problems, and a lack of ability to detoxify harmful substances.

For a complete list of videos, visit our video library