This topic contains a solution. Click here to go to the answer

Author Question: A/An _____ system takes a period-by-period set of master production schedule requirements ... (Read 98 times)

saliriagwu

  • Hero Member
  • *****
  • Posts: 537
A/An _____ system takes a period-by-period set of master production schedule requirements (anticipated or booked customer orders) and produces a time-phased set of material, component, and subassembly requirements timed to support an expected build schedule.
 a. kanban
 b. DRP
 c. just-in-time
 d. perfect order
 e. MRP

Question 2

All of the following are services except:
 a. This class.
  b. A checking account.
  c. A Broadway musical.
  d. An oil change for a car.
  e. A book.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

meltdown117

  • Sr. Member
  • ****
  • Posts: 326
Answer to Question 1

a

Answer to Question 2

E




meltdown117

  • Sr. Member
  • ****
  • Posts: 326

 

Did you know?

Many of the drugs used by neuroscientists are derived from toxic plants and venomous animals (such as snakes, spiders, snails, and puffer fish).

Did you know?

The liver is the only organ that has the ability to regenerate itself after certain types of damage. As much as 25% of the liver can be removed, and it will still regenerate back to its original shape and size. However, the liver cannot regenerate after severe damage caused by alcohol.

Did you know?

Between 1999 and 2012, American adults with high total cholesterol decreased from 18.3% to 12.9%

Did you know?

Throughout history, plants containing cardiac steroids have been used as heart drugs and as poisons (e.g., in arrows used in combat), emetics, and diuretics.

Did you know?

Anti-aging claims should not ever be believed. There is no supplement, medication, or any other substance that has been proven to slow or stop the aging process.

For a complete list of videos, visit our video library