This topic contains a solution. Click here to go to the answer

Author Question: When building a model, an economist must: a. adjust for exceptional situations. b. provide a ... (Read 69 times)

Diane

  • Hero Member
  • *****
  • Posts: 576
When building a model, an economist must:
 a. adjust for exceptional situations. b. provide a complete description of reality.
  c. make simplifying assumptions. d. develop a set of behavioral equations.

Question 2

A model (or theory):
 a. is a general statement about the causal relationship between variables based on facts.
  b. helps explain and predict the relationship between variables.
  c. when expressed as a downward (negatively) sloping graph implies an inverse relationship between the variables.
  d. all of these.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

carolinefletcherr

  • Sr. Member
  • ****
  • Posts: 313
Answer to Question 1

c

Answer to Question 2

d



Diane

  • Hero Member
  • *****
  • Posts: 576


 

Did you know?

To prove that stomach ulcers were caused by bacteria and not by stress, a researcher consumed an entire laboratory beaker full of bacterial culture. After this, he did indeed develop stomach ulcers, and won the Nobel Prize for his discovery.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

In 1864, the first barbiturate (barbituric acid) was synthesized.

Did you know?

Sperm cells are so tiny that 400 to 500 million (400,000,000–500,000,000) of them fit onto 1 tsp.

Did you know?

According to the FDA, adverse drug events harmed or killed approximately 1,200,000 people in the United States in the year 2015.

For a complete list of videos, visit our video library