An unfavorable flexible-budget variance for variable costs may be the result of ________.
 
  A) using more input quantities than were budgeted
  B) paying lower prices for inputs than were budgeted
  C) selling output at a higher selling price than budgeted
  D) selling less quantity compared to the budgeted

Question 2

Which of the following is true of flexible budget?
 
  A) It calculates total variable cost by multiplying actual units by budgeted variable cost per unit.
  B) It calculates total fixed cost by multiplying actual units by budgeted fixed cost per unit.
  C) It calculates revenues by multiplying budgeted units by actual selling price per unit.
  D) It calculates contribution margin by multiplying budgeted units by actual contribution margin per unit.



nmyers

  • Sr. Member
  • ****
  • Posts: 336
Answer to Question 1

Answer: A

Answer to Question 2

Answer: A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

In 1886, William Bates reported on the discovery of a substance produced by the adrenal gland that turned out to be epinephrine (adrenaline). In 1904, this drug was first artificially synthesized by Friedrich Stolz.

Did you know?

The horizontal fraction bar was introduced by the Arabs.

Did you know?

Throughout history, plants containing cardiac steroids have been used as heart drugs and as poisons (e.g., in arrows used in combat), emetics, and diuretics.

Did you know?

Cucumber slices relieve headaches by tightening blood vessels, reducing blood flow to the area, and relieving pressure.

Did you know?

There are more bacteria in your mouth than there are people in the world.

For a complete list of videos, visit our video library