Author Question: An example of planned change is A) change in organizational strategy. B) an economic downturn. ... (Read 106 times)

ishan

  • Hero Member
  • *****
  • Posts: 546
An example of planned change is
 
  A) change in organizational strategy.
  B) an economic downturn.
  C) a change in customer demand for the firm's product.
  D) all of the above

Question 2

Building quality into the product rather than relying on quality inspections after the product has already been made reflects a principle of
 
  A) scientific management.
  B) TQM.
  C) MRP.
  D) cross-functional teams.



joewallace

  • Sr. Member
  • ****
  • Posts: 337
Answer to Question 1

A

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The people with the highest levels of LDL are Mexican American males and non-Hispanic black females.

Did you know?

Green tea is able to stop the scent of garlic or onion from causing bad breath.

Did you know?

Elderly adults are at greatest risk of stroke and myocardial infarction and have the most to gain from prophylaxis. Patients ages 60 to 80 years with blood pressures above 160/90 mm Hg should benefit from antihypertensive treatment.

Did you know?

Side effects from substance abuse include nausea, dehydration, reduced productivitiy, and dependence. Though these effects usually worsen over time, the constant need for the substance often overcomes rational thinking.

Did you know?

Elderly adults are living longer, and causes of death are shifting. At the same time, autopsy rates are at or near their lowest in history.

For a complete list of videos, visit our video library