This topic contains a solution. Click here to go to the answer

Author Question: Explain the importance of the requirements analysis phase of the systems development lifecycle ... (Read 131 times)

joblessjake

  • Hero Member
  • *****
  • Posts: 555
Explain the importance of the requirements analysis phase of the systems development lifecycle (SDLC).
 
  What will be an ideal response?

Question 2

Which of the following statements is true about the points system?
 
  A) Points are assigned by the clients at the beginning of the project.
  B) The most difficult task is assigned a point score of 1.
  C) Consecutive integers are used to award point scores to tasks.
  D) Points estimate the relative difficulty, rather than the relative duration of tasks.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

verrinzo

  • Sr. Member
  • ****
  • Posts: 346
Answer to Question 1

Determining the system's requirements is the most important phase in the systems
development process. If the requirements are wrong, the system will be wrong. If the
requirements are determined completely and correctly, then design and implementation will be
easier and more likely to result in success. Examples of requirements are the contents and the
format of Web pages and the functions of buttons on those pages, or the structure and content of
a report, or the fields and menu choices in a data entry form. Security is another important
category of requirements. The easiest and cheapest time to alter the information system is in the
requirements phase. Changing a requirement at this stage is simply a matter of changing a
description. Changing a requirement in the implementation phase may require weeks of
reworking applications components and the database.

Answer to Question 2

D





 

Did you know?

Blood is approximately twice as thick as water because of the cells and other components found in it.

Did you know?

Not getting enough sleep can greatly weaken the immune system. Lack of sleep makes you more likely to catch a cold, or more difficult to fight off an infection.

Did you know?

There used to be a metric calendar, as well as metric clocks. The metric calendar, or "French Republican Calendar" divided the year into 12 months, but each month was divided into three 10-day weeks. Each day had 10 decimal hours. Each hour had 100 decimal minutes. Due to lack of popularity, the metric clocks and calendars were ended in 1795, three years after they had been first marketed.

Did you know?

It is difficult to obtain enough calcium without consuming milk or other dairy foods.

Did you know?

Common abbreviations that cause medication errors include U (unit), mg (milligram), QD (every day), SC (subcutaneous), TIW (three times per week), D/C (discharge or discontinue), HS (at bedtime or "hours of sleep"), cc (cubic centimeters), and AU (each ear).

For a complete list of videos, visit our video library