Author Question: Which of the following is the key to successful systems development life cycle (SDLC) projects? ... (Read 50 times)

sjones

  • Hero Member
  • *****
  • Posts: 520
Which of the following is the key to successful systems development life cycle (SDLC) projects?
 
  A) critical path template
  B) work breakdown structure
  C) scatter plot
  D) control chart

Question 2

The recursive relationship between consultant mentors and mentored has a __________
  cardinality.
 
  Fill in the blanks with correct word



tuwy

  • Sr. Member
  • ****
  • Posts: 336
Answer to Question 1

B

Answer to Question 2

one-to-many



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

Did you know?

Side effects from substance abuse include nausea, dehydration, reduced productivitiy, and dependence. Though these effects usually worsen over time, the constant need for the substance often overcomes rational thinking.

Did you know?

Complications of influenza include: bacterial pneumonia, ear and sinus infections, dehydration, and worsening of chronic conditions such as asthma, congestive heart failure, or diabetes.

Did you know?

This year, an estimated 1.4 million Americans will have a new or recurrent heart attack.

Did you know?

The human body's pharmacokinetics are quite varied. Our hair holds onto drugs longer than our urine, blood, or saliva. For example, alcohol can be detected in the hair for up to 90 days after it was consumed. The same is true for marijuana, cocaine, ecstasy, heroin, methamphetamine, and nicotine.

For a complete list of videos, visit our video library