Author Question: Which part of the baseline project report contains an outline of the recommended course of action? ... (Read 45 times)

bobbie

  • Hero Member
  • *****
  • Posts: 592
Which part of the baseline project report contains an outline of the recommended course of action?
 
  A) Introduction
  B) Feasibility assessment
  C) Management issues
  D) System description

Question 2

Which of the following is NOT a component of PERT?
 
  A) Program
  B) Evolution
  C) Review
  D) Evaluation



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

TheNamesImani

  • Sr. Member
  • ****
  • Posts: 334
Answer to Question 1

A

Answer to Question 2

B




bobbie

  • Member
  • Posts: 592
Reply 2 on: Jul 7, 2018
YES! Correct, THANKS for helping me on my review


bimper21

  • Member
  • Posts: 309
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

Most women experience menopause in their 50s. However, in 1994, an Italian woman gave birth to a baby boy when she was 61 years old.

Did you know?

When Gabriel Fahrenheit invented the first mercury thermometer, he called "zero degrees" the lowest temperature he was able to attain with a mixture of ice and salt. For the upper point of his scale, he used 96°, which he measured as normal human body temperature (we know it to be 98.6° today because of more accurate thermometers).

Did you know?

Many medications that are used to treat infertility are injected subcutaneously. This is easy to do using the anterior abdomen as the site of injection but avoiding the area directly around the belly button.

Did you know?

In most climates, 8 to 10 glasses of water per day is recommended for adults. The best indicator for adequate fluid intake is frequent, clear urination.

Did you know?

Women are 50% to 75% more likely than men to experience an adverse drug reaction.

For a complete list of videos, visit our video library