Author Question: Which of the following issues should be addressed when considering reuse? A) The current lack of ... (Read 52 times)

Engineer

  • Hero Member
  • *****
  • Posts: 527
Which of the following issues should be addressed when considering reuse?
 
  A) The current lack of a methodology for creating and clearly defining and labeling reusable components for placement in a library
  B) The lack of commitment to reuse
  C) Lack of proper training and rewards needed to promote reuse
  D) The analyst's ability in using objects

Question 2

Which of the following is NOT a possible decision outcome for a project?
 
  A) Accept the project
  B) Reject the project
  C) Evaluate criteria
  D) Proof of concept


orangecrush

  • Sr. Member
  • ****
  • Posts: 350
Answer to Question 1

D

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The National Institutes of Health have supported research into acupuncture. This has shown that acupuncture significantly reduced pain associated with osteoarthritis of the knee, when used as a complement to conventional therapies.

Did you know?

Cocaine was isolated in 1860 and first used as a local anesthetic in 1884. Its first clinical use was by Sigmund Freud to wean a patient from morphine addiction. The fictional character Sherlock Holmes was supposed to be addicted to cocaine by injection.

Did you know?

As of mid-2016, 18.2 million people were receiving advanced retroviral therapy (ART) worldwide. This represents between 43–50% of the 34–39.8 million people living with HIV.

Did you know?

The longest a person has survived after a heart transplant is 24 years.

Did you know?

All adverse reactions are commonly charted in red ink in the patient's record and usually are noted on the front of the chart. Failure to follow correct documentation procedures may result in malpractice lawsuits.

For a complete list of videos, visit our video library