This topic contains a solution. Click here to go to the answer

Author Question: Which of the following is the last activity in the SDLC process? A) implementing the system B) ... (Read 71 times)

iveyjurea

  • Hero Member
  • *****
  • Posts: 555
Which of the following is the last activity in the SDLC process?
 
  A) implementing the system
  B) testing the system
  C) creating system components
  D) maintaining the system

Question 2

A benchmark is a baseline measurement considered as optimal, though it is sometimes simply an industry average.
 
  Indicate whether the statement is true or false



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

moormoney

  • Sr. Member
  • ****
  • Posts: 326
Answer to Question 1

D

Answer to Question 2

TRUE





 

Did you know?

The first oral chemotherapy drug for colon cancer was approved by FDA in 2001.

Did you know?

Acute bronchitis is an inflammation of the breathing tubes (bronchi), which causes increased mucus production and other changes. It is usually caused by bacteria or viruses, can be serious in people who have pulmonary or cardiac diseases, and can lead to pneumonia.

Did you know?

Medications that are definitely not safe to take when breastfeeding include radioactive drugs, antimetabolites, some cancer (chemotherapy) agents, bromocriptine, ergotamine, methotrexate, and cyclosporine.

Did you know?

People with high total cholesterol have about two times the risk for heart disease as people with ideal levels.

Did you know?

Most strokes are caused when blood clots move to a blood vessel in the brain and block blood flow to that area. Thrombolytic therapy can be used to dissolve the clot quickly. If given within 3 hours of the first stroke symptoms, this therapy can help limit stroke damage and disability.

For a complete list of videos, visit our video library