Author Question: Another way a systems analyst can show the scope of a system and define proper system boundariesis ... (Read 217 times)

skymedlock

  • Hero Member
  • *****
  • Posts: 561
Another way a systems analyst can show the scope of a system and define proper system boundariesis to use a(n) ________.
 
  A) flow chart
  B) entity-relationship diagram
  C) database diagram
  D) spreadsheet

Question 2

The ERP life cycle is often just as rigorous as the traditional ________ life cycle.
 
  A) network
  B) project
  C) BIM
  D) SDLC



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

epscape

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

B

Answer to Question 2

D





 

Did you know?

Liver spots have nothing whatsoever to do with the liver. They are a type of freckles commonly seen in older adults who have been out in the sun without sufficient sunscreen.

Did you know?

The first oncogene was discovered in 1970 and was termed SRC (pronounced "SARK").

Did you know?

To prove that stomach ulcers were caused by bacteria and not by stress, a researcher consumed an entire laboratory beaker full of bacterial culture. After this, he did indeed develop stomach ulcers, and won the Nobel Prize for his discovery.

Did you know?

Throughout history, plants containing cardiac steroids have been used as heart drugs and as poisons (e.g., in arrows used in combat), emetics, and diuretics.

Did you know?

There used to be a metric calendar, as well as metric clocks. The metric calendar, or "French Republican Calendar" divided the year into 12 months, but each month was divided into three 10-day weeks. Each day had 10 decimal hours. Each hour had 100 decimal minutes. Due to lack of popularity, the metric clocks and calendars were ended in 1795, three years after they had been first marketed.

For a complete list of videos, visit our video library