Author Question: When framing a floor opening, the short pieces installed parallel to the common joists are called ... (Read 77 times)

TVarnum

  • Hero Member
  • *****
  • Posts: 548
When framing a floor opening, the short pieces installed parallel to the common joists are called _____.
 
  a. trimmers
  b. tail joists
  c. purlins
  d. header joists

Question 2

The bottom ends of cross-bridging are not nailed in place until _____.
 
  a. the subfloor is installed
  b. wall framing is erected
  c. the building is closed in
  d. approved by the inspector



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

aloop

  • Sr. Member
  • ****
  • Posts: 315
Answer to Question 1

b

Answer to Question 2

a




TVarnum

  • Member
  • Posts: 548
Reply 2 on: Jul 24, 2018
Excellent


komodo7

  • Member
  • Posts: 322
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

When blood is exposed to air, it clots. Heparin allows the blood to come in direct contact with air without clotting.

Did you know?

The average adult has about 21 square feet of skin.

Did you know?

The U.S. Preventive Services Task Force recommends that all women age 65 years of age or older should be screened with bone densitometry.

Did you know?

The human body's pharmacokinetics are quite varied. Our hair holds onto drugs longer than our urine, blood, or saliva. For example, alcohol can be detected in the hair for up to 90 days after it was consumed. The same is true for marijuana, cocaine, ecstasy, heroin, methamphetamine, and nicotine.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

For a complete list of videos, visit our video library