This topic contains a solution. Click here to go to the answer

Author Question: Equipment schedules are part of the _____. a. floor plans b. electrical drawings c. sectional ... (Read 88 times)

dalyningkenk

  • Hero Member
  • *****
  • Posts: 598
Equipment schedules are part of the _____.
 
  a. floor plans
  b. electrical drawings
  c. sectional drawings
  d. shop drawings

Question 2

An electrical drawings title block includes the _____.
 
  a. address of the project
  b. start date
  c. symbols list
  d. name of the general contractor



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

ultraflyy23

  • Sr. Member
  • ****
  • Posts: 312
Answer to Question 1

b

Answer to Question 2

a




dalyningkenk

  • Member
  • Posts: 598
Reply 2 on: Jul 24, 2018
Gracias!


hollysheppard095

  • Member
  • Posts: 339
Reply 3 on: Yesterday
YES! Correct, THANKS for helping me on my review

 

Did you know?

Eating carrots will improve your eyesight. Carrots are high in vitamin A (retinol), which is essential for good vision. It can also be found in milk, cheese, egg yolks, and liver.

Did you know?

Green tea is able to stop the scent of garlic or onion from causing bad breath.

Did you know?

Multiple sclerosis is a condition wherein the body's nervous system is weakened by an autoimmune reaction that attacks the myelin sheaths of neurons.

Did you know?

Nearly 31 million adults in America have a total cholesterol level that is more than 240 mg per dL.

Did you know?

Fewer than 10% of babies are born on their exact due dates, 50% are born within 1 week of the due date, and 90% are born within 2 weeks of the date.

For a complete list of videos, visit our video library