Author Question: When preparing a job site for excavation or construction, the removal of objects below the original ... (Read 159 times)

amal

  • Hero Member
  • *****
  • Posts: 572
When preparing a job site for excavation or construction, the removal of objects below the original ground
  level is called _____.
 
  a. clearing
  b. stripping
  c. grubbing
  d. scalping

Question 2

When concrete is being delivered to a construction site, an area must be set aside for _____.
 
  a. truck parking
  b. slump testing
  c. refueling the trucks
  d. weighing loads



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

shaikhs

  • Sr. Member
  • ****
  • Posts: 312
Answer to Question 1

c

Answer to Question 2

b





 

Did you know?

The calories found in one piece of cherry cheesecake could light a 60-watt light bulb for 1.5 hours.

Did you know?

The oldest recorded age was 122. Madame Jeanne Calment was born in France in 1875 and died in 1997. She was a vegetarian and loved olive oil, port wine, and chocolate.

Did you know?

For pediatric patients, intravenous fluids are the most commonly cited products involved in medication errors that are reported to the USP.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

Approximately 70% of expectant mothers report experiencing some symptoms of morning sickness during the first trimester of pregnancy.

For a complete list of videos, visit our video library