Which of the following is a general NEC requirement for installing boxes?
 
  A) The box must be at least 2 deep.
  B) The box must be installed flush to the wall surface.
  C) The box must be of a sufficient size to permit locknuts to be properly installed.
  D) The finished installation must be accessible for future repair or maintenance.

Question 2

What size of a junction box must be used if there is one 4 conduit and two 3 conduits entering on one side of
  the box and exiting at a 90 angle on another side of the box? (Assume the conductor size is No. 4 AWG or
  larger.)
 
  A) 30
  B) 48
  C) 56
  D) 60



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

KKcool

  • Sr. Member
  • ****
  • Posts: 340
Answer to Question 1

Answer: D

Answer to Question 2

Answer: A




KKcool

  • Sr. Member
  • ****
  • Posts: 340

 

Did you know?

Blood is approximately twice as thick as water because of the cells and other components found in it.

Did you know?

Bacteria have been found alive in a lake buried one half mile under ice in Antarctica.

Did you know?

In 1844, Charles Goodyear obtained the first patent for a rubber condom.

Did you know?

About 3% of all pregnant women will give birth to twins, which is an increase in rate of nearly 60% since the early 1980s.

Did you know?

One way to reduce acid reflux is to lose two or three pounds. Most people lose weight in the belly area first when they increase exercise, meaning that heartburn can be reduced quickly by this method.

For a complete list of videos, visit our video library