Author Question: Doubled top plates are required in SIP construction. The end joints in top plates must be offset by ... (Read 542 times)

piesebel

  • Hero Member
  • *****
  • Posts: 565
Doubled top plates are required in SIP construction. The end joints in top plates must be offset by a minimum of ________ inches.
 
  A) 6 B) 18 C) 12 D) 24

Question 2

The ________ method of cutting lumber is the least expensive and most commonly used for residential rough framing.
 
  A) Dimensional B) Plainsawn C) Quartersawn D) Nominal



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

yeungji

  • Sr. Member
  • ****
  • Posts: 319
Answer to Question 1

D

Answer to Question 2

B




piesebel

  • Member
  • Posts: 565
Reply 2 on: Jul 24, 2018
Wow, this really help


sultana.d

  • Member
  • Posts: 320
Reply 3 on: Yesterday
Excellent

 

Did you know?

Pope Sylvester II tried to introduce Arabic numbers into Europe between the years 999 and 1003, but their use did not catch on for a few more centuries, and Roman numerals continued to be the primary number system.

Did you know?

Bacteria have been found alive in a lake buried one half mile under ice in Antarctica.

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

Did you know?

Methicillin-resistant Staphylococcus aureus or MRSA was discovered in 1961 in the United Kingdom. It if often referred to as a superbug. MRSA infections cause more deaths in the United States every year than AIDS.

Methicilli ...
Did you know?

Fewer than 10% of babies are born on their exact due dates, 50% are born within 1 week of the due date, and 90% are born within 2 weeks of the date.

For a complete list of videos, visit our video library