This topic contains a solution. Click here to go to the answer

Author Question: The construction procedure for panel assembly of SIPs should always start ________. A) In one ... (Read 70 times)

Redwolflake15

  • Hero Member
  • *****
  • Posts: 569
The construction procedure for panel assembly of SIPs should always start ________.
 
  A) In one direction  from left to right B) Prior to placement on the subflooring
  C) In the middle of a through-wall D) In a corner

Question 2

What is the highest moisture content allowed for residential framing material?
 
  A) 15 B) 9 C) 30 D) 19



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

jgranad15

  • Sr. Member
  • ****
  • Posts: 345
Answer to Question 1

D

Answer to Question 2

D




Redwolflake15

  • Member
  • Posts: 569
Reply 2 on: Jul 24, 2018
Excellent


nathang24

  • Member
  • Posts: 314
Reply 3 on: Yesterday
Great answer, keep it coming :)

 

Did you know?

Patients who have undergone chemotherapy for the treatment of cancer often complain of a lack of mental focus; memory loss; and a general diminution in abilities such as multitasking, attention span, and general mental agility.

Did you know?

There are 20 feet of blood vessels in each square inch of human skin.

Did you know?

Everyone has one nostril that is larger than the other.

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

Did you know?

The lipid bilayer is made of phospholipids. They are arranged in a double layer because one of their ends is attracted to water while the other is repelled by water.

For a complete list of videos, visit our video library