Which organization provides free downloadable documents related to facets of working with code-approved subflooring, I-joists, and other engineered materials?
A) LEED B) EarthCraft C) APA D) IRC
Question 2
For a building 28' 42', how many linear feet of top and bottom wall plates are required when framing with the OVE techniques?
A) 280' B) 140' C) 420' D) 70'