This topic contains a solution. Click here to go to the answer

Author Question: The primary and auxiliary drain lines should be: A) Piped separately. B) Run level to assure an ... (Read 19 times)

notis

  • Hero Member
  • *****
  • Posts: 596
The primary and auxiliary drain lines should be:
 
  A) Piped separately.
  B) Run level to assure an air seal.
  C) Piped together to ensure proper drainage.
  D) Connected inside the unit and then piped out together.

Question 2

What should be done to prepare an oil pump for operation in a one-pipe oil delivery system?
 
  A) The internal bypass plug should be removed.
  B) The internal bypass plug should be installed.
  C) The oil burner motor must be set for high speed.
  D) The oil burner must be set for low speed.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

popopong

  • Sr. Member
  • ****
  • Posts: 307
Answer to Question 1

A

Answer to Question 2

A




notis

  • Member
  • Posts: 596
Reply 2 on: Jul 24, 2018
Gracias!


ryansturges

  • Member
  • Posts: 338
Reply 3 on: Yesterday
Great answer, keep it coming :)

 

Did you know?

In 1844, Charles Goodyear obtained the first patent for a rubber condom.

Did you know?

People with alcoholism are at a much greater risk of malnutrition than are other people and usually exhibit low levels of most vitamins (especially folic acid). This is because alcohol often takes the place of 50% of their daily intake of calories, with little nutritional value contained in it.

Did you know?

More than 4.4billion prescriptions were dispensed within the United States in 2016.

Did you know?

The term pharmacology is derived from the Greek words pharmakon("claim, medicine, poison, or remedy") and logos ("study").

Did you know?

Nearly 31 million adults in America have a total cholesterol level that is more than 240 mg per dL.

For a complete list of videos, visit our video library