Wiring for a four-port multisplit system runs:
A) Three wires to each indoor unit. B) One wire to each indoor unit.
C) Four wires to each indoor unit. D) Two wires to each indoor unit.
Question 2
A load study that calculates the load for each individual room as well as the entire house is called:
A) A unified load calculation. B) A composite load calculation.
C) A shell load calculation. D) A room-by-room load calculation.