This topic contains a solution. Click here to go to the answer

Author Question: Which installation phase is performed first? A) Piping installation B) Electrical connection C) ... (Read 104 times)

lindiwe

  • Hero Member
  • *****
  • Posts: 577
Which installation phase is performed first?
 
  A) Piping installation B) Electrical connection
  C) Equipment placement D) Ductwork installation

Question 2

Pneumatic control systems:
 
  A) Are the most recent type of commercial control. B) Use electric motors to modulate control valves.
  C) Have no moving parts. D) Use air pressure to modulate control valves.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

spencer.martell

  • Sr. Member
  • ****
  • Posts: 342
Answer to Question 1

C

Answer to Question 2

D




lindiwe

  • Member
  • Posts: 577
Reply 2 on: Jul 24, 2018
Wow, this really help


nguyenhoanhat

  • Member
  • Posts: 332
Reply 3 on: Yesterday
Excellent

 

Did you know?

The human body's pharmacokinetics are quite varied. Our hair holds onto drugs longer than our urine, blood, or saliva. For example, alcohol can be detected in the hair for up to 90 days after it was consumed. The same is true for marijuana, cocaine, ecstasy, heroin, methamphetamine, and nicotine.

Did you know?

This year, an estimated 1.4 million Americans will have a new or recurrent heart attack.

Did you know?

The first oncogene was discovered in 1970 and was termed SRC (pronounced "SARK").

Did you know?

According to the CDC, approximately 31.7% of the U.S. population has high low-density lipoprotein (LDL) or "bad cholesterol" levels.

Did you know?

The modern decimal position system was the invention of the Hindus (around 800 AD), involving the placing of numerals to indicate their value (units, tens, hundreds, and so on).

For a complete list of videos, visit our video library