Answer to Question 1
Sources of information on the system sequence of operation include the manufacturer's installation and operation and manuals, unit wiring diagrams, unit charging charts, and general textbooks.
Answer to Question 2
R control power to thermostat Y Compressor
Evaporator Float Switch Liquid Low Pressure Switch High Pressure Switch
Anti short cycle timer Compressor Contactor Defrost Control
Run Capacitor