Author Question: In each diary kept by the owner/engineer's or contractor's personnel, entries should be made: A. ... (Read 188 times)

rosent76

  • Hero Member
  • *****
  • Posts: 516
In each diary kept by the owner/engineer's or contractor's personnel, entries should be made:
 
  A. to document every working day, whether any work is performed or not, or even if you did not go to the project site that day.
   B. only if something of particular importance is happening.
   C. regularly each time that you visit a site where work is being done; however, no entry need be made unless you were personally at the site and witnessed work being performed.
   D. A diary is neither necessary nor desirable on construction.

Question 2

What are the project phases of construction projects?
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

Sammyo

  • Sr. Member
  • ****
  • Posts: 329
Answer to Question 1

A

Answer to Question 2

The project phases of construction projects are feasibility, preplanning and engineering design, engineering and procurement, bidding and award, construction, testing and operation, and demolition.



rosent76

  • Hero Member
  • *****
  • Posts: 516
Both answers were spot on, thank you once again



Sammyo

  • Sr. Member
  • ****
  • Posts: 329

 

Did you know?

Though the United States has largely rejected the metric system, it is used for currency, as in 100 pennies = 1 dollar. Previously, the British currency system was used, with measurements such as 12 pence to the shilling, and 20 shillings to the pound.

Did you know?

As many as 28% of hospitalized patients requiring mechanical ventilators to help them breathe (for more than 48 hours) will develop ventilator-associated pneumonia. Current therapy involves intravenous antibiotics, but new antibiotics that can be inhaled (and more directly treat the infection) are being developed.

Did you know?

There are over 65,000 known species of protozoa. About 10,000 species are parasitic.

Did you know?

The newest statin drug, rosuvastatin, has been called a superstatin because it appears to reduce LDL cholesterol to a greater degree than the other approved statin drugs.

Did you know?

Hippocrates noted that blood separates into four differently colored liquids when removed from the body and examined: a pure red liquid mixed with white liquid material with a yellow-colored froth at the top and a black substance that settles underneath; he named these the four humors (for blood, phlegm, yellow bile, and black bile).

For a complete list of videos, visit our video library