Author Question: If an owner orders work removed in order to conduct an inspection who is responsible for the cost of ... (Read 140 times)

karen

  • Hero Member
  • *****
  • Posts: 537
If an owner orders work removed in order to conduct an inspection who is responsible for the cost of replacing the work and why?
 
  What will be an ideal response?

Question 2

If an inspector discovers defects in the work is he or she allowed to order that the work be changed and why or why not?
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

Chocorrol77

  • Sr. Member
  • ****
  • Posts: 313
Answer to Question 1

If an inspection clause is included that resembles the following and an owner orders work to be removed to conduct an inspection then the contractor is responsible for replacing defective work: A clause that allows the owner's representative to order work to be removed to inspect work that has been covered up by the work with no recourse for the contractor, and at the expense of the contractor, for replacing the work.

Answer to Question 2

Inspectors are responsible for ensuring that the work is performed in accordance with the contract documents but it needs to be realized that if the contract is incorrect it is not the responsibility of the inspector to change it, as they are not empowered to do this during construction. Inspectors are only allowed to assist the engineer as the engineer corrects the situation by issuing revisions, extras, or adjustments to correct the contract requirements.




karen

  • Member
  • Posts: 537
Reply 2 on: Jul 26, 2018
:D TYSM


Zebsrer

  • Member
  • Posts: 284
Reply 3 on: Yesterday
Thanks for the timely response, appreciate it

 

Did you know?

IgA antibodies protect body surfaces exposed to outside foreign substances. IgG antibodies are found in all body fluids. IgM antibodies are the first type of antibody made in response to an infection. IgE antibody levels are often high in people with allergies. IgD antibodies are found in tissues lining the abdomen and chest.

Did you know?

In 1844, Charles Goodyear obtained the first patent for a rubber condom.

Did you know?

Malaria was not eliminated in the United States until 1951. The term eliminated means that no new cases arise in a country for 3 years.

Did you know?

Cancer has been around as long as humankind, but only in the second half of the twentieth century did the number of cancer cases explode.

Did you know?

Each year in the United States, there are approximately six million pregnancies. This means that at any one time, about 4% of women in the United States are pregnant.

For a complete list of videos, visit our video library