This topic contains a solution. Click here to go to the answer

Author Question: If there is a conflict between the following DOT Contract Documents, which will normally control? ... (Read 123 times)

mp14

  • Hero Member
  • *****
  • Posts: 534
If there is a conflict between the following DOT Contract Documents, which will normally control?
 
  A. Special Provisions
   B. Plans. (The Drawings)
   C. Standard Plans.
   D. Standard Specifications.

Question 2

The Inspector's relationship to the contractor is like that of:
 
  A. an inferior.
   B. an antagonist.
   C. a superior.
   D. a policeman.
   E. none of the above.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

alexisweber49

  • Sr. Member
  • ****
  • Posts: 311
Answer to Question 1

A

Answer to Question 2

E




mp14

  • Member
  • Posts: 534
Reply 2 on: Jul 26, 2018
Gracias!


sultana.d

  • Member
  • Posts: 320
Reply 3 on: Yesterday
Excellent

 

Did you know?

Cucumber slices relieve headaches by tightening blood vessels, reducing blood flow to the area, and relieving pressure.

Did you know?

Long-term mental and physical effects from substance abuse include: paranoia, psychosis, immune deficiencies, and organ damage.

Did you know?

The average adult has about 21 square feet of skin.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

The average office desk has 400 times more bacteria on it than a toilet.

For a complete list of videos, visit our video library