Author Question: A resident project representative should be held responsible for: A. informing sub-contractors of ... (Read 52 times)

sc00by25

  • Hero Member
  • *****
  • Posts: 596
A resident project representative should be held responsible for:
 
  A. informing sub-contractors of the need of materials.
   B. keeping the architect/engineer informed as to the progress of the work.
   C. keeping the general contractor informed as to the job schedule
   D. acting as liaison between jurisdictional agencies.
   E. safety on or about the project site.

Question 2

Authorization to the contractor to perform work which involves a deviation from the requirements of the Contract Documents is called an:
 
  A. addendum.
   B. alternate.
   C. new contract.
   D. change order.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

okolip

  • Sr. Member
  • ****
  • Posts: 362
Answer to Question 1

B

Answer to Question 2

D




sc00by25

  • Member
  • Posts: 596
Reply 2 on: Jul 26, 2018
Gracias!


sailorcrescent

  • Member
  • Posts: 334
Reply 3 on: Yesterday
Excellent

 

Did you know?

Alzheimer's disease affects only about 10% of people older than 65 years of age. Most forms of decreased mental function and dementia are caused by disuse (letting the mind get lazy).

Did you know?

The liver is the only organ that has the ability to regenerate itself after certain types of damage. As much as 25% of the liver can be removed, and it will still regenerate back to its original shape and size. However, the liver cannot regenerate after severe damage caused by alcohol.

Did you know?

Human stomach acid is strong enough to dissolve small pieces of metal such as razor blades or staples.

Did you know?

There used to be a metric calendar, as well as metric clocks. The metric calendar, or "French Republican Calendar" divided the year into 12 months, but each month was divided into three 10-day weeks. Each day had 10 decimal hours. Each hour had 100 decimal minutes. Due to lack of popularity, the metric clocks and calendars were ended in 1795, three years after they had been first marketed.

Did you know?

The FDA recognizes 118 routes of administration.

For a complete list of videos, visit our video library