This topic contains a solution. Click here to go to the answer

Author Question: Before operating the vertical band machine, you should: A) Check the speed range transmission oil ... (Read 56 times)

Pea0909berry

  • Hero Member
  • *****
  • Posts: 573
Before operating the vertical band machine, you should:
 
  A) Check the speed range transmission oil level B) Check the hydraulic oil level
  C) Lubricate the variable speed pulley hub D) All of the above

Question 2

Serial taps of the same nominal size:
 
  A) Have different pitch diameters B) Have the same pitch diameters
  C) Can be used in any sequence D) Are used in mass production



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

sailorcrescent

  • Sr. Member
  • ****
  • Posts: 334
Answer to Question 1

D

Answer to Question 2

A




Pea0909berry

  • Member
  • Posts: 573
Reply 2 on: Jul 26, 2018
Great answer, keep it coming :)


raenoj

  • Member
  • Posts: 340
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

The training of an anesthesiologist typically requires four years of college, 4 years of medical school, 1 year of internship, and 3 years of residency.

Did you know?

The shortest mature adult human of whom there is independent evidence was Gul Mohammed in India. In 1990, he was measured in New Delhi and stood 22.5 inches tall.

Did you know?

In 2012, nearly 24 milliion Americans, aged 12 and older, had abused an illicit drug, according to the National Institute on Drug Abuse (NIDA).

Did you know?

In the United States, there is a birth every 8 seconds, according to the U.S. Census Bureau's Population Clock.

Did you know?

Asthma occurs in one in 11 children and in one in 12 adults. African Americans and Latinos have a higher risk for developing asthma than other groups.

For a complete list of videos, visit our video library