Author Question: A control malfunction that results from a system heating or cooling past its setpoint is called: ... (Read 27 times)

misspop

  • Hero Member
  • *****
  • Posts: 540
A control malfunction that results from a system heating or cooling past its setpoint is called:
 
  A) Anticipation. B) Temperature swing.
  C) Overshoot. D) Lag.

Question 2

When hanging flexible duct, the hanging material should be at least:
 
  A) 2 in wide and spaced no further than every 12 ft.
  B) 2 in wide and spaced no further than every 5 ft.
  C) 1 in wide and spaced no further than every 5 ft.
  D) 1 in wide and spaced no further than every 12 ft.



zoeyesther

  • Sr. Member
  • ****
  • Posts: 315
Answer to Question 1

C

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

No drugs are available to relieve parathyroid disease. Parathyroid disease is caused by a parathyroid tumor, and it needs to be removed by surgery.

Did you know?

The first-known contraceptive was crocodile dung, used in Egypt in 2000 BC. Condoms were also reportedly used, made of animal bladders or intestines.

Did you know?

People about to have surgery must tell their health care providers about all supplements they take.

Did you know?

Street names for barbiturates include reds, red devils, yellow jackets, blue heavens, Christmas trees, and rainbows. They are commonly referred to as downers.

Did you know?

More than 34,000 trademarked medication names and more than 10,000 generic medication names are in use in the United States.

For a complete list of videos, visit our video library