This topic contains a solution. Click here to go to the answer

Author Question: A roofer lifts supplies a height of 20. m with a hand-operated winch. How long would it take him to ... (Read 7 times)

arivle123

  • Hero Member
  • *****
  • Posts: 569
A roofer lifts supplies a height of 20. m with a hand-operated winch. How long would it take him to lift a 200. kg load, if the winch has an efficiency of 90, and the rate at which the winch can do work is 0.80 hp?
 
  What will be an ideal response?

Question 2

The Earth is divided into 24 time zones, in each of which local time differs by 1 hour. At 45 N latitude, what is the width of a time zone? (The Earth's radius is 6370 km.
 
  45 N latitude is about as far North as Portland, Oregon, and is halfway between the equator and the North pole.)



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

morganmarie791

  • Sr. Member
  • ****
  • Posts: 336
Answer to Question 1

73. seconds

Answer to Question 2

1179 km





 

Did you know?

Approximately 15–25% of recognized pregnancies end in miscarriage. However, many miscarriages often occur before a woman even knows she is pregnant.

Did you know?

The B-complex vitamins and vitamin C are not stored in the body and must be replaced each day.

Did you know?

Disorders that may affect pharmacodynamics include genetic mutations, malnutrition, thyrotoxicosis, myasthenia gravis, Parkinson's disease, and certain forms of insulin-resistant diabetes mellitus.

Did you know?

Calcitonin is a naturally occurring hormone. In women who are at least 5 years beyond menopause, it slows bone loss and increases spinal bone density.

Did you know?

Approximately 500,000 babies are born each year in the United States to teenage mothers.

For a complete list of videos, visit our video library