Author Question: The first company to build PLCs was ________. A) Allen Bradley B) General Motors C) Modicon D) ... (Read 34 times)

OSWALD

  • Hero Member
  • *****
  • Posts: 580
The first company to build PLCs was ________.
 
  A) Allen Bradley B) General Motors C) Modicon D) Square D

Question 2

Which of the following statements is correct?
 
  A) The number of ladder logic virtual relays and input and output instructions is limited only by memory size.
  B) The number of contacts for a mechanical relay is limited to number of coils on the relay.
  C) A ladder logic program is hard to analyze because it is totally different when compared with the equivalent relay logic solution.
  D) Ladder logic is a PLC graphical programming technique introduced in the last 10 years.



Sierray

  • Sr. Member
  • ****
  • Posts: 343
Answer to Question 1

C

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

There are more sensory neurons in the tongue than in any other part of the body.

Did you know?

The familiar sounds of your heart are made by the heart's valves as they open and close.

Did you know?

Side effects from substance abuse include nausea, dehydration, reduced productivitiy, and dependence. Though these effects usually worsen over time, the constant need for the substance often overcomes rational thinking.

Did you know?

Interferon was scarce and expensive until 1980, when the interferon gene was inserted into bacteria using recombinant DNA technology, allowing for mass cultivation and purification from bacterial cultures.

Did you know?

Blood is approximately twice as thick as water because of the cells and other components found in it.

For a complete list of videos, visit our video library