This topic contains a solution. Click here to go to the answer

Author Question: Planning the inside wire plant deployment is as important as planning cable layout in the outside ... (Read 79 times)

fagboi

  • Hero Member
  • *****
  • Posts: 535
Planning the inside wire plant deployment is as important as planning cable layout in the outside plant.
 
  Indicate whether the statement is true or false

Question 2

Grounding and bounding a cable is required to:
 
  A) Reduce outside interference from electrical noise.
  B) Improve resistance of wire.
  C) Reduce chance of being electrocuted.
  D) All of the above
  E) None of the above



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

Koolkid240

  • Sr. Member
  • ****
  • Posts: 357
Answer to Question 1

TRUE

Answer to Question 2

D




fagboi

  • Member
  • Posts: 535
Reply 2 on: Jul 28, 2018
Great answer, keep it coming :)


miss.ashley

  • Member
  • Posts: 371
Reply 3 on: Yesterday
Thanks for the timely response, appreciate it

 

Did you know?

During pregnancy, a woman is more likely to experience bleeding gums and nosebleeds caused by hormonal changes that increase blood flow to the mouth and nose.

Did you know?

In most cases, kidneys can recover from almost complete loss of function, such as in acute kidney (renal) failure.

Did you know?

The Babylonians wrote numbers in a system that used 60 as the base value rather than the number 10. They did not have a symbol for "zero."

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

For pediatric patients, intravenous fluids are the most commonly cited products involved in medication errors that are reported to the USP.

For a complete list of videos, visit our video library