Author Question: Concurrent schedule is to matching law as A) simultaneity of reinforcement is to proportionality ... (Read 57 times)

fbq8i

  • Hero Member
  • *****
  • Posts: 527
Concurrent schedule is to matching law as
 
  A) simultaneity of reinforcement is to proportionality of reinforcers.
  B) proportionality of reinforcers is to simultaneity of reinforcement.
  C) S is to SD.
  D) SD is to S.

Question 2

In a concurrent schedule, the component schedules
 
  A) provide only punishers.
  B) are sequentially available.
  C) Both a and b are correct.
  D) Neither a nor b is correct.



DylanD1323

  • Sr. Member
  • ****
  • Posts: 314
Answer to Question 1

A

Answer to Question 2

D



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

Did you know?

Serum cholesterol testing in adults is recommended every 1 to 5 years. People with diabetes and a family history of high cholesterol should be tested even more frequently.

Did you know?

The largest baby ever born weighed more than 23 pounds but died just 11 hours after his birth in 1879. The largest surviving baby was born in October 2009 in Sumatra, Indonesia, and weighed an astounding 19.2 pounds at birth.

Did you know?

Drugs are in development that may cure asthma and hay fever once and for all. They target leukotrienes, which are known to cause tightening of the air passages in the lungs and increase mucus productions in nasal passages.

Did you know?

The most common treatment options for addiction include psychotherapy, support groups, and individual counseling.

For a complete list of videos, visit our video library