This topic contains a solution. Click here to go to the answer

Author Question: The following are some of the requirements of Supplier Development. Which are not correct? (1). ... (Read 20 times)

Alainaaa8

  • Hero Member
  • *****
  • Posts: 576
The following are some of the requirements of Supplier Development. Which are not correct? (1). Focus on inspections after receipt (2). Implement judoka program (3). Reduce supplier lead times (4). Require frequent deliveries
 a. (1) c. (3) and (4)
  b. (2) and (3) d. None of the above

Question 2

When there are two treatment groups, one-way ANOVA is equivalent to the pooled-variances t-test.
  Indicate whether the statement is true or false



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

kardosa007

  • Sr. Member
  • ****
  • Posts: 300
Answer to Question 1

A

Answer to Question 2

T



Alainaaa8

  • Hero Member
  • *****
  • Posts: 576
Both answers were spot on, thank you once again




 

Did you know?

Patients should never assume they are being given the appropriate drugs. They should make sure they know which drugs are being prescribed, and always double-check that the drugs received match the prescription.

Did you know?

Pope Sylvester II tried to introduce Arabic numbers into Europe between the years 999 and 1003, but their use did not catch on for a few more centuries, and Roman numerals continued to be the primary number system.

Did you know?

The strongest synthetic topical retinoid drug available, tazarotene, is used to treat sun-damaged skin, acne, and psoriasis.

Did you know?

Certain chemicals, after ingestion, can be converted by the body into cyanide. Most of these chemicals have been removed from the market, but some old nail polish remover, solvents, and plastics manufacturing solutions can contain these substances.

Did you know?

Everyone has one nostril that is larger than the other.

For a complete list of videos, visit our video library