This topic contains a solution. Click here to go to the answer

Author Question: What of the following is an appropriate inspection plan? a. Inspecting the finished goods in the ... (Read 94 times)

sdfghj

  • Hero Member
  • *****
  • Posts: 552
What of the following is an appropriate inspection plan?
 
  a. Inspecting the finished goods in the first 5 to 10 of the production is useful to check production quality.
  b. Inspecting the finished goods during the pre-production stage is a must.
  c. Inspecting the finished goods in a predetermined time and location assures the outcomes of inspection.
  d. Random inspection is great but almost impossible.

Question 2

The U.S. Federal Trade Commission has a ________ percent tolerance for fiber content claims on labels.
 
  a. 1
  b. 3
  c. 5
  d. 7



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

Sweetkitty24130

  • Sr. Member
  • ****
  • Posts: 291
Answer to Question 1

a

Answer to Question 2

b





 

Did you know?

The FDA recognizes 118 routes of administration.

Did you know?

There are 20 feet of blood vessels in each square inch of human skin.

Did you know?

The shortest mature adult human of whom there is independent evidence was Gul Mohammed in India. In 1990, he was measured in New Delhi and stood 22.5 inches tall.

Did you know?

There are approximately 3 million unintended pregnancies in the United States each year.

Did you know?

Nitroglycerin is used to alleviate various heart-related conditions, and it is also the chief component of dynamite (but mixed in a solid clay base to stabilize it).

For a complete list of videos, visit our video library