This topic contains a solution. Click here to go to the answer

Author Question: Program evaluations are expensive and time-consuming, but they are done to improve the quality and ... (Read 149 times)

Metfan725

  • Hero Member
  • *****
  • Posts: 552
Program evaluations are expensive and time-consuming, but they are done to improve the quality and should be welcomed.
 
  a. True
  b. False

Question 2

Formal program assessment helps monitor the staff.
 
  a. True
  b. False



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

LVPMS

  • Sr. Member
  • ****
  • Posts: 323
Answer to Question 1

ANSWER: True

Answer to Question 2

ANSWER: True





 

Did you know?

Interferon was scarce and expensive until 1980, when the interferon gene was inserted into bacteria using recombinant DNA technology, allowing for mass cultivation and purification from bacterial cultures.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

During the twentieth century, a variant of the metric system was used in Russia and France in which the base unit of mass was the tonne. Instead of kilograms, this system used millitonnes (mt).

Did you know?

Approximately 15–25% of recognized pregnancies end in miscarriage. However, many miscarriages often occur before a woman even knows she is pregnant.

Did you know?

People with alcoholism are at a much greater risk of malnutrition than are other people and usually exhibit low levels of most vitamins (especially folic acid). This is because alcohol often takes the place of 50% of their daily intake of calories, with little nutritional value contained in it.

For a complete list of videos, visit our video library