If machine maintenance is scheduled at a time when production is at a low level, then ________.
◦ low production is the cost driver of high repair costs
◦ an understanding of operations is needed to determine an appropriate cost driver
◦ low production should be avoided since it is the cause of machine maintenance
◦ machine maintenance cannot be accurately predicted