Author Question: Assume you and your supervisor discussed a project that you will begin soon. The supervisor ... (Read 511 times)

burton19126

  • Hero Member
  • *****
  • Posts: 532
Assume you and your supervisor discussed a project that you will begin soon. The supervisor identified the problem to study and the purpose of the study but asks that you prepare a proposal before beginning the work. What factor can you safely exclude from the proposal?
 a. Definition of problem and purpose
  b. Delimitations
  c. Estimate of resources needed
  d. Limitations

Question 2

Identify the verb in the sentence. He approves all travel requests.



nguyenhoanhat

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

d

Answer to Question 2

approves



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Anti-aging claims should not ever be believed. There is no supplement, medication, or any other substance that has been proven to slow or stop the aging process.

Did you know?

Your heart beats over 36 million times a year.

Did you know?

People with high total cholesterol have about two times the risk for heart disease as people with ideal levels.

Did you know?

It is widely believed that giving a daily oral dose of aspirin to heart attack patients improves their chances of survival because the aspirin blocks the formation of new blood clots.

Did you know?

IgA antibodies protect body surfaces exposed to outside foreign substances. IgG antibodies are found in all body fluids. IgM antibodies are the first type of antibody made in response to an infection. IgE antibody levels are often high in people with allergies. IgD antibodies are found in tissues lining the abdomen and chest.

For a complete list of videos, visit our video library