Author Question: Assume you and your supervisor discussed a project that you will begin soon. The supervisor ... (Read 323 times)

burton19126

  • Hero Member
  • *****
  • Posts: 532
Assume you and your supervisor discussed a project that you will begin soon. The supervisor identified the problem to study and the purpose of the study but asks that you prepare a proposal before beginning the work. What factor can you safely exclude from the proposal?
 a. Definition of problem and purpose
  b. Delimitations
  c. Estimate of resources needed
  d. Limitations

Question 2

Identify the verb in the sentence. He approves all travel requests.



nguyenhoanhat

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

d

Answer to Question 2

approves



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Asthma cases in Americans are about 75% higher today than they were in 1980.

Did you know?

Fatal fungal infections may be able to resist newer antifungal drugs. Globally, fungal infections are often fatal due to the lack of access to multiple antifungals, which may be required to be utilized in combination. Single antifungals may not be enough to stop a fungal infection from causing the death of a patient.

Did you know?

In the United States, congenital cytomegalovirus causes one child to become disabled almost every hour. CMV is the leading preventable viral cause of development disability in newborns. These disabilities include hearing or vision loss, and cerebral palsy.

Did you know?

Normal urine is sterile. It contains fluids, salts, and waste products. It is free of bacteria, viruses, and fungi.

Did you know?

Increased intake of vitamin D has been shown to reduce fractures up to 25% in older people.

For a complete list of videos, visit our video library