Author Question: Assume you and your supervisor discussed a project that you will begin soon. The supervisor ... (Read 510 times)

burton19126

  • Hero Member
  • *****
  • Posts: 532
Assume you and your supervisor discussed a project that you will begin soon. The supervisor identified the problem to study and the purpose of the study but asks that you prepare a proposal before beginning the work. What factor can you safely exclude from the proposal?
 a. Definition of problem and purpose
  b. Delimitations
  c. Estimate of resources needed
  d. Limitations

Question 2

Identify the verb in the sentence. He approves all travel requests.



nguyenhoanhat

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

d

Answer to Question 2

approves



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Historic treatments for rheumatoid arthritis have included gold salts, acupuncture, a diet consisting of apples or rhubarb, nutmeg, nettles, bee venom, bracelets made of copper, prayer, rest, tooth extractions, fasting, honey, vitamins, insulin, snow collected on Christmas, magnets, and electric convulsion therapy.

Did you know?

The training of an anesthesiologist typically requires four years of college, 4 years of medical school, 1 year of internship, and 3 years of residency.

Did you know?

Women are two-thirds more likely than men to develop irritable bowel syndrome. This may be attributable to hormonal changes related to their menstrual cycles.

Did you know?

It is important to read food labels and choose foods with low cholesterol and saturated trans fat. You should limit saturated fat to no higher than 6% of daily calories.

Did you know?

Complications of influenza include: bacterial pneumonia, ear and sinus infections, dehydration, and worsening of chronic conditions such as asthma, congestive heart failure, or diabetes.

For a complete list of videos, visit our video library