Author Question: Activities with zero slack a. can be delayed. b. must be completed first. c. lie on a critical ... (Read 45 times)

ETearle

  • Hero Member
  • *****
  • Posts: 580
Activities with zero slack
 a. can be delayed.
  b. must be completed first.
  c. lie on a critical path.
  d. have no predecessors.

Question 2

A measure of the strength of the relationship between two variables is the _____.
 a. confidence interval estimate
  b. slope b1 of the estimated regression line
  c. standard error of the estimate
  d. correlation coefficient



chreslie

  • Sr. Member
  • ****
  • Posts: 307
Answer to Question 1

C

Answer to Question 2

d



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

After a vasectomy, it takes about 12 ejaculations to clear out sperm that were already beyond the blocked area.

Did you know?

Computer programs are available that crosscheck a new drug's possible trade name with all other trade names currently available. These programs detect dangerous similarities between names and alert the manufacturer of the drug.

Did you know?

Ether was used widely for surgeries but became less popular because of its flammability and its tendency to cause vomiting. In England, it was quickly replaced by chloroform, but this agent caused many deaths and lost popularity.

Did you know?

Disorders that may affect pharmacodynamics include genetic mutations, malnutrition, thyrotoxicosis, myasthenia gravis, Parkinson's disease, and certain forms of insulin-resistant diabetes mellitus.

Did you know?

More than 30% of American adults, and about 12% of children utilize health care approaches that were developed outside of conventional medicine.

For a complete list of videos, visit our video library