Author Question: Activities with zero slack a. can be delayed. b. must be completed first. c. lie on a critical ... (Read 75 times)

ETearle

  • Hero Member
  • *****
  • Posts: 580
Activities with zero slack
 a. can be delayed.
  b. must be completed first.
  c. lie on a critical path.
  d. have no predecessors.

Question 2

A measure of the strength of the relationship between two variables is the _____.
 a. confidence interval estimate
  b. slope b1 of the estimated regression line
  c. standard error of the estimate
  d. correlation coefficient



chreslie

  • Sr. Member
  • ****
  • Posts: 307
Answer to Question 1

C

Answer to Question 2

d



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Inotropic therapy does not have a role in the treatment of most heart failure patients. These drugs can make patients feel and function better but usually do not lengthen the predicted length of their lives.

Did you know?

The Romans did not use numerals to indicate fractions but instead used words to indicate parts of a whole.

Did you know?

The shortest mature adult human of whom there is independent evidence was Gul Mohammed in India. In 1990, he was measured in New Delhi and stood 22.5 inches tall.

Did you know?

Drugs are in development that may cure asthma and hay fever once and for all. They target leukotrienes, which are known to cause tightening of the air passages in the lungs and increase mucus productions in nasal passages.

Did you know?

If all the neurons in the human body were lined up, they would stretch more than 600 miles.

For a complete list of videos, visit our video library