Referring to the SPC chart signals that a process is out of control, what type of problem does each signal indicate? List the signals.
 
  What will be an ideal response?

Question 2

Which of the following is true about forecast bias?
 
  A) It is the mean absolute deviation.
  B) It is equal to the square root of the MSE.
  C) When it is negative it means that the forecasts tended to be high.
  D) When it is positive it means that the forecasts tended to be high.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

SeanoH09

  • Sr. Member
  • ****
  • Posts: 323
Answer to Question 1

The signals that something has changed are:
1. one or more points outside the control limits
2. nine or more points in a row above or below the center line
3. six or more points moving in the same direction (up or down)
4. 14 points in a row, alternating up and down.

The first signal means that something has caused the process to produce a higher (or lower) measure than would be normally expected. This could be a problem with variability or a jump one way or the other in the process center. Only one such point above or below the control limits is needed to reach the conclusion that a special cause situation exists.

The second signal implies that the process center is drifting up or down. For example, this type of situation could occur in a process that is sensitive to temperature. If for some reason temperature gradually is increasing, the output measure will gradually change with the temperature change.

The third signal indicates that the process average has shifted (higher or lower) due to some special circumstance. For instance, a control setting may have been changed causing the output measures to increase or decrease consistently.

The fourth signal indicates something is causing the process to change between measurements.

Answer to Question 2

C




Beheh

  • Member
  • Posts: 520
Reply 2 on: Jun 24, 2018
Wow, this really help


apple

  • Member
  • Posts: 352
Reply 3 on: Yesterday
Great answer, keep it coming :)

 

Did you know?

Medication errors are more common among seriously ill patients than with those with minor conditions.

Did you know?

Famous people who died from poisoning or drug overdose include, Adolf Hitler, Socrates, Juan Ponce de Leon, Marilyn Monroe, Judy Garland, and John Belushi.

Did you know?

In Eastern Europe and Russia, interferon is administered intranasally in varied doses for the common cold and influenza. It is claimed that this treatment can lower the risk of infection by as much as 60–70%.

Did you know?

About 60% of newborn infants in the United States are jaundiced; that is, they look yellow. Kernicterus is a form of brain damage caused by excessive jaundice. When babies begin to be affected by excessive jaundice and begin to have brain damage, they become excessively lethargic.

Did you know?

All patients with hyperparathyroidism will develop osteoporosis. The parathyroid glands maintain blood calcium within the normal range. All patients with this disease will continue to lose calcium from their bones every day, and there is no way to prevent the development of osteoporosis as a result.

For a complete list of videos, visit our video library