Author Question: Referring to the SPC chart signals that a process is out of control, what type of problem does each ... (Read 124 times)

Beheh

  • Hero Member
  • *****
  • Posts: 520
Referring to the SPC chart signals that a process is out of control, what type of problem does each signal indicate? List the signals.
 
  What will be an ideal response?

Question 2

Which of the following is true about forecast bias?
 
  A) It is the mean absolute deviation.
  B) It is equal to the square root of the MSE.
  C) When it is negative it means that the forecasts tended to be high.
  D) When it is positive it means that the forecasts tended to be high.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

SeanoH09

  • Sr. Member
  • ****
  • Posts: 323
Answer to Question 1

The signals that something has changed are:
1. one or more points outside the control limits
2. nine or more points in a row above or below the center line
3. six or more points moving in the same direction (up or down)
4. 14 points in a row, alternating up and down.

The first signal means that something has caused the process to produce a higher (or lower) measure than would be normally expected. This could be a problem with variability or a jump one way or the other in the process center. Only one such point above or below the control limits is needed to reach the conclusion that a special cause situation exists.

The second signal implies that the process center is drifting up or down. For example, this type of situation could occur in a process that is sensitive to temperature. If for some reason temperature gradually is increasing, the output measure will gradually change with the temperature change.

The third signal indicates that the process average has shifted (higher or lower) due to some special circumstance. For instance, a control setting may have been changed causing the output measures to increase or decrease consistently.

The fourth signal indicates something is causing the process to change between measurements.

Answer to Question 2

C




Beheh

  • Member
  • Posts: 520
Reply 2 on: Jun 24, 2018
Thanks for the timely response, appreciate it


lkanara2

  • Member
  • Posts: 329
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

Anesthesia awareness is a potentially disturbing adverse effect wherein patients who have been paralyzed with muscle relaxants may awaken. They may be aware of their surroundings but unable to communicate or move. Neurologic monitoring equipment that helps to more closely check the patient's anesthesia stages is now available to avoid the occurrence of anesthesia awareness.

Did you know?

During the twentieth century, a variant of the metric system was used in Russia and France in which the base unit of mass was the tonne. Instead of kilograms, this system used millitonnes (mt).

Did you know?

The liver is the only organ that has the ability to regenerate itself after certain types of damage. As much as 25% of the liver can be removed, and it will still regenerate back to its original shape and size. However, the liver cannot regenerate after severe damage caused by alcohol.

Did you know?

Though newer “smart” infusion pumps are increasingly becoming more sophisticated, they cannot prevent all programming and administration errors. Health care professionals that use smart infusion pumps must still practice the rights of medication administration and have other professionals double-check all high-risk infusions.

Did you know?

Cyanide works by making the human body unable to use oxygen.

For a complete list of videos, visit our video library