Author Question: If a contractor begins work before the construction mortgage is recorded, the contractor's lien has ... (Read 82 times)

ap345

  • Hero Member
  • *****
  • Posts: 537
If a contractor begins work before the construction mortgage is recorded, the contractor's lien has priority over that mortgage.
  Indicate whether the statement is true or false

Question 2

If a trustee is not elected by creditors, an interim trustee will be appointed by the court.
  Indicate whether the statement is true or false



ririgirl15

  • Sr. Member
  • ****
  • Posts: 385
Answer to Question 1

TRUE

Answer to Question 2

TRUE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Barbituric acid, the base material of barbiturates, was first synthesized in 1863 by Adolph von Bayer. His company later went on to synthesize aspirin for the first time, and Bayer aspirin is still a popular brand today.

Did you know?

The shortest mature adult human of whom there is independent evidence was Gul Mohammed in India. In 1990, he was measured in New Delhi and stood 22.5 inches tall.

Did you know?

Adults are resistant to the bacterium that causes Botulism. These bacteria thrive in honey – therefore, honey should never be given to infants since their immune systems are not yet resistant.

Did you know?

The heart is located in the center of the chest, with part of it tipped slightly so that it taps against the left side of the chest.

Did you know?

It is believed that the Incas used anesthesia. Evidence supports the theory that shamans chewed cocoa leaves and drilled holes into the heads of patients (letting evil spirits escape), spitting into the wounds they made. The mixture of cocaine, saliva, and resin numbed the site enough to allow hours of drilling.

For a complete list of videos, visit our video library